Construction

Stay tuned — big things are coming!

Completed Projects

Installation Directorate of Hajj and Religious A airs in Laghman

On-Grid 8 KW Solar System Installation Test & Commissioning Location: Laghman Province, Directorate of Hajj and Religious A airs Inverter: High Quality On-grid (without battery backup) Solar Panels: A Grade Solar 550 W

Contact Us
Installation Ahmad Shah Baba Mena In Kabul

Installation of 4.2 kW Hybrid Solar System Location: Ahmad Shah Baba Mena, Kabul Inverter: Hybrid 4.2 kW Solar Panels: Grade A Batteries: Gel batteries with high quality and long lifespan

Contact Us
Installation Laghman, Ali Khil School

Procurement, Installation & Commissioning of 6 Kw Hybrid Solar Power Location: Laghman Province, Ali Khil Girls’ High School Inverter: Hybrid 6.2 kW Solar Panels: 250 W, Grade A Batteries: Lead-acid, 200 Ah

Contact Us
Installation in Laghman Khala Khil Village

Installation of 10 kW Solar system Location: Laghman Province, Khala Khil Village Inverter: 10.2 kW Batteries: 4 Tubular batteries, 200 Ah each Solar Panels: 550 W, A Grade

Contact Us
Installation Ahmad Shah Baba Mena, Kabul

Installation of 4.2 kW Hybrid Solar System Location: Ahmad Shah Baba Mena, Kabul Inverter: Hybrid 4.2 kW Solar Panels: Grade A Batteries: Gel batteries with high quality and long lifespan

Contact Us
Installation in Kabul, Central Power, Olympia Mobile Sales

Installation, Test & Commissioning of 4 kW Solar System Location: Kabul Province, Central Power, Olympia Mobile Sales Inverter: Hybrid 4.2 kW, 24 Volt Battery: High-quality lead-acid, 12 Volt, 150 Ampere-hour Solar Panel: A Grade 610 W

Contact Us
Under Construction

Thank you for your patience and support.

Construction